This project involved installing emergency vehicle preemption systems at 19 intersections across New Smyrna Beach, FL, to enhance emergency response times and improve safety.
Project Overview
The purpose of this project was to improve emergency vehicle access and response efficiency by modifying existing signalized intersections to include emergency vehicle preemption technology. This system prioritizes signal changes for emergency vehicles, allowing them to navigate intersections more safely and quickly.
Project Leadership and Scope
Members of the TRIUNE team served as the Project Manager and Engineer of Record for this initiative, overseeing the design, implementation, and integration of preemption systems at the designated intersections.
Design Features and Innovations
The project included:
Integration of emergency vehicle preemption hardware at 19 signalized intersections
Development of tailored preemption phasing and timing settings to ensure smooth operation
Coordination with Volusia County, responsible for signal maintenance, to align with technical and operational requirements
Collaboration with the City of New Smyrna Beach Fire Department to ensure the system met emergency response needs
Coordination and Analysis
Extensive coordination was conducted with local agencies and emergency services to align the system with real-world operational demands. This collaborative approach ensured that the preemption systems functioned effectively, optimizing signal timing to provide seamless emergency vehicle access.
Enhanced Emergency Response and Safety
The implementation of emergency vehicle preemption systems significantly improved response times for emergency services in New Smyrna Beach. By prioritizing emergency vehicles at intersections, the project enhanced safety for both emergency responders and the public, reducing the risk of accidents and delays.
For more information about this project and how our expertise can enhance your infrastructure, please contact us today!


